Overview
Capital Sports Construction, Inc. partnered with Carmel Clay High School in Carmel, IN to upgrade its baseball facility by replacing an aging natural grass field with a modern synthetic turf system. The new field provides consistent performance, improved drainage, and a durable playing surface capable of supporting heavy use throughout the year.
This project modernizes the school’s athletic infrastructure with contemporary sports construction practices, enhanced grading and drainage, and a high-performance turf system engineered for long-term reliability.
Project Goals
- Replace the natural grass baseball field with a dependable and consistent synthetic turf surface
- Improve drainage to reduce weather-related delays and cancellations
- Reduce maintenance requirements and long-term operational costs
- Provide a safe, high-quality field suitable for daily practices and competitive play
- Extend year-round usability for athletes and coaches
Our Scope of Work
Site Design & Engineering
The project began with a full review of the existing field conditions, including slope, drainage behavior, and soil composition. Design planning focused on reshaping the field profile, improving stormwater management, and preparing a stable foundation for synthetic turf. The engineering process ensured proper field elevations and drainage pathways to support reliable performance in varying weather conditions.
Site Construction
The construction phase included demolition of the grass field and preparation for synthetic turf installation. Key activities included:
- Complete removal of the existing natural grass surface
- Precision grading to establish correct field geometry
- Installation of a compacted aggregate base engineered for efficient drainage
- Construction of underfield drainage channels and supporting infrastructure
- Preparation of the sub-base to ensure long-term structural integrity
These steps aligned with best practices in athletic facility construction, ensuring that the new turf system would perform consistently and withstand continuous use.
Synthetic Turf Installation
Carmel Clay High School’s new field was built using a high-quality synthetic turf installation designed specifically for baseball. Work included:
- Placement of a durable monofilament turf surface
- Installation of performance infill selected for traction, ball response, and shock absorption
- Integration of infield and outfield turf color zones
- Permanent installation of baseball-specific markings and field components
The synthetic turf surface allows players to experience consistent footing, predictable ball behavior, and improved safety throughout the season.
Project Highlights
- Replaced a natural grass field with a reliable and low-maintenance synthetic turf system
- Significantly improved drainage, reducing downtime after rain
- Enhanced player safety and playability with uniform surface conditions
- Reduced long-term maintenance costs and field labor requirements
- Delivered a visually upgraded baseball facility ready for year-round activity
- Created a durable surface capable of supporting training, practices, and competitive games
Results
The synthetic turf conversion has transformed the baseball facility at Carmel Clay High School. The new field offers dependable performance in all seasons, allowing teams to maximize practice time and minimize interruptions caused by weather. Coaches and athletes benefit from a uniform playing surface that improves safety, supports skill development, and creates a professional-quality environment.
The upgraded facility also provides long-term value through lower maintenance requirements and improved durability, ensuring that the school’s investment continues to benefit its athletic program for years to come.
Services Provided
- Site Design
- Site Construction
- Synthetic Turf Installation
Client Profile
Carmel Clay High School is a well-established public high school in Carmel, IN with a strong athletic program. The school sought to modernize its baseball facility to support year-round training, improve field reliability, and provide athletes with a high-quality playing environment.