Overview
Capital Sports Construction, Inc. partnered with Merrimack Soccer Complex in Huntsville, AL to install synthetic turf across eight soccer fields. The project transformed heavily used grass fields into durable, all-weather playing surfaces designed to support tournament play, league schedules, and community recreation with minimal disruption from rain or overuse.
The upgraded fields significantly increase the complex’s capacity to host games and events, while providing consistent footing, predictable ball response, and a professional-quality experience for players and spectators.
Project Goals
- Convert multiple natural grass fields to modern synthetic turf surfaces
- Improve drainage and reduce weather-related cancellations or delays
- Provide consistent, high-performance playing conditions for all age groups
- Reduce long-term maintenance and water usage compared to natural grass
- Support tournament play and high-volume local league scheduling
Our Scope of Work
Site Design and Engineering
The project began with a detailed review of the existing field layout, grading, and drainage conditions across the complex. Design work focused on establishing uniform field elevations, efficient stormwater management, and an engineered base structure capable of supporting eight synthetic turf fields used intensively throughout the year.
Site Construction
Construction activities included removal of existing grass surfaces where needed, regrading to achieve target slopes, and installation of compacted aggregate base layers under each field. Drainage infrastructure was integrated into the base system to handle heavy rain while preserving surface integrity and playability. Each field’s sub-base was prepared to meet the structural demands of a modern turf system under frequent competitive use.
Synthetic Turf Installation
With base work in place, synthetic turf systems were installed on eight soccer fields. The installation included:
- Placement of high-quality turf designed for soccer-specific performance
- Performance infill calibrated for traction, ball behavior, and impact absorption
- Seam and perimeter detailing built to withstand heavy traffic and maintenance cycles
- Final field striping and layouts suitable for club, league, and tournament play
The new surfaces support fast-paced soccer with reliable footing and consistent play across every field.
Project Highlights
- Converted eight heavily used soccer fields to synthetic turf surfaces
- Improved drainage and reduced downtime after rain events
- Delivered consistent, tournament-ready playing conditions across the complex
- Lowered ongoing maintenance demands relative to natural grass
- Increased capacity for regional tournaments, league play, and training
- Enhanced player safety and experience through predictable surface conditions
Results
Following the turf installation, Merrimack Soccer Complex can support significantly more games, practices, and events with fewer interruptions from weather or field rest requirements. The synthetic turf fields provide a reliable, professional-feeling environment for players of all ages and levels, from recreational leagues to competitive tournaments.
The complex now offers durable, low-maintenance fields that help the city meet growing demand for soccer programming, while ensuring that surfaces remain consistent and safe throughout the playing season.
Services Provided
- Site Design
- Site Construction
- Synthetic Turf Installation
Client Profile
Merrimack Soccer Complex in Huntsville, AL is a major regional hub for soccer, serving local clubs, youth programs, adult leagues, and visiting tournament teams. The conversion of multiple fields to synthetic turf supports the complex’s role as a high-capacity, year-round soccer destination.