Overview
Capital Sports Construction, Inc. partnered with Webb Bridge Park in Alpharetta, GA to complete the engineered basework required for a new synthetic turf multi-purpose athletic field. This foundational phase establishes the grading, drainage, and sub-base stability necessary to support the future installation of a modern, high-performance turf system capable of accommodating year-round community sports.
The improvements enhance the park’s ability to provide safe, consistent, and durable athletic facilities for local leagues and recreational users.
Project Goals
- Prepare the site for installation of a high-quality synthetic turf surface
- Establish precise grading and drainage controls for long-term field performance
- Improve field stability and structural integrity for multi-sport use
- Reduce maintenance requirements and surface inconsistencies
- Support future construction phases with a durable engineered foundation
Our Scope of Work
Site Design and Engineering
The project began with design evaluations focused on field layout, elevation targets, and drainage integration. Engineering plans ensured that the new multi-purpose field would rest on a stable, well-constructed sub-base able to support heavy athletic use and withstand seasonal weather conditions.
Site Construction (Basework)
Construction activities centered on building the structural foundation for the future turf field. Work included:
- Excavation and removal of existing surface materials
- Precision grading to achieve target slopes and promote proper runoff
- Installation of engineered aggregate layers for sub-base stability
- Integration of drainage systems to manage water flow and prevent saturation
- Compaction and preparation of the base to synthetic turf specifications
This phase ensures that the incoming turf system will perform reliably and safely over its full lifespan.
Project Highlights
- Completed engineered basework for a new synthetic turf multi-purpose field
- Improved site drainage for enhanced year-round playability
- Delivered a stable, uniform sub-base ready for turf installation
- Supported the park’s ability to expand athletic programming and capacity
- Reduced long-term maintenance needs through proper subsurface construction
- Strengthened community infrastructure for youth sports and recreation
Results
With the engineered basework complete, Webb Bridge Park is positioned to install a new synthetic turf surface that will dramatically enhance the usability and durability of the multi-purpose field. The improved drainage, grading, and sub-base structure create a dependable foundation for a modern athletic facility serving local leagues, school groups, and recreational programs.
The project provides long-term value by increasing field reliability, reducing maintenance demands, and supporting consistent athletic performance.
Services Provided
- Site Design
- Site Construction
- Sub-base and Drainage Preparation
Client Profile
Webb Bridge Park is a community recreation facility in Alpharetta, GA offering athletic fields, trails, and open spaces for youth sports and family activities. The basework project supports the city’s commitment to providing safe, high-quality recreational amenities for residents.